Structure Fire In Wernersville Borough |
| September 17, 2023 | |
| On 9/17 just before 0200 E85 was dispatched to the CCs pizza for multiple calls reporting a building fire. Once on scene engine 85 laid a supply line to E18-1 who arrived shortly before and began fire attack. E85 pulled a second line made their way to the second floor where they assisted with fire suppression and over haul. Crews remained on scene for around 2.5hrs prior to being released by command. |
|